THE contractor of the Metro Rail Transit (MRT) 7 finally paid the Metropolitan Manila Development Authority (MMDA) P25,000 as penalty for putting up a 2-kilometer barrier along Elliptical Road in Quezon City without the agency’s permission and consequently causing heavy traffic in the area.

MMDA General Manager Jose “Jojo” Garcia told the Manila Times that Equipment Engineers Inc. (EEI) delivered on its promise to pay the fine.

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details