VANCOUVER, British Columbia, Feb. 27, 2025 (GLOBE NEWSWIRE) -- Entrée Resources Ltd. (TSX:ETG; OTCQB:ERLFF - the "Company” or "Entrée”) is pleased to provide analytical results for eleven underground diamond drill holes ("DDH”) completed in 2022 - 2024 at the Hugo North Extension ("HNE”) deposit on the Entrée/Oyu Tolgoi joint venture property (the "Entrée/Oyu Tolgoi JV Property”) in Mongolia. Analytical results are also provided for one DDH completed at the western edge of the Heruga copper-gold-molybdenum deposit and five DDH from the 2024 regional drilling campaign.

One underground DDH from the 2023 drilling program at HNE, two surface DDH and eight underground DDH from the 2024 drilling program at HNE, and two 2024 regional DDH are pending analytical results. These results will be reported as they become available from the Company's joint venture partner Oyu Tolgoi LLC ("OTLLC”).

DRILL HOLE HIGHLIGHTS

HNE Underground Drill Holes

  • UGD 578: 164 m grading 1.61% copper equivalent ("CuEq”), including 72 metres ("m”) grading 2.89% CuEq.
  • UGD 807C: 465.5 m grading 1.51% CuEq, including 188.5 m grading 2.50% CuEq.
  • UGD 815: 224 m grading 2.05% CuEq.
  • UGD 852: 351.2 m grading 1.53% CuEq, including 104 m grading 2.65% CuEq.
Heruga Drill Hole

Get the latest news
delivered to your inbox
Sign up for The Manila Times newsletters
By signing up with an email address, I acknowledge that I have read and agree to the Terms of Service and Privacy Policy.

  • EJD0099: 409.9 m grading 0.58% CuEq, including 230 m grading 0.79% CuEq.

    Note: Copper equivalent for HNE and Heruga are defined below Table 1, where full details on the drill hole assay intervals are also found.

Stephen Scott, Entrée's President and CEO commented, "We are very pleased to be able to report additional results from drilling completed in 2022, 2023, and 2024. UGD578, which was drilled in 2022 for geotechnical purposes and not assayed until 2024, has returned outstanding results. The results from the 2023 underground drilling reported in this update are some of the best we've received since HNE deposit drilling restarted in 2022. We are also excited to see very promising results from the first hole drilled at the Heruga deposit in more than 12 years. This hole is further west than any previous drilling and demonstrates that more work is needed to fully understand the deposit's true potential”.

HNE DRILLING RESULTS

The new drill hole analytical results from the HNE deposit include eleven underground DDH completed during 2022, 2023, and 2024 (Table 1). This includes drill hole UGD 578 from 2022 that was previously classified by OTLLC as a geotechnical hole that would not be analyzed. Four underground DDH from 2023 and six underground DDH from 2024 are also reported. These holes were all collared from existing infrastructure on the Oyu Tolgoi mining licence and drilled to the north or northwest onto the Entrée/Oyu Tolgoi JV Property, targeting mineralization within the existing footprint of the HNE deposit.

OTLLC has informed Entrée that three of the 2023 surface drill holes (EGD175, EGD176 and EGD182) that were noted by the Company on July 18, 2024 as "pending analytical results” will not be assayed since they were used purely for geotechnical and metallurgical purposes or were abandoned prior to reaching the target depth. A total of two surface DDH and eight underground DDH from the 2024 drilling program at HNE are still pending analytical results and will be reported as they become available from OTLLC.

Mineralized intervals from the eleven DDH at HNE recently made available by OTLLC are summarized in Table 1 and are shown on Figure 1. 

Table 1: Underground Drill Results from 2022, 2023, and 2024 Drilling at the HNE Deposit1

Drill HoleYearFrom

(m)

To

(m)

Length2

(m)

Copper

(%)

Gold

(ppm)

Silver

(ppm)

CuEq3

(%)

UGD57820221503141641.360.423.251.61
Including 206278722.420.805.892.89
UGD807C2023205.1661.6456.51.190.563.161.51
including 420608.5188.51.950.945.232.50
UGD8122023nosignificantassays    
UGD81520232985222241.750.504.502.05
UGD8162023293.1421.3128.21.630.244.181.79
UGD8062024111.2522410.81.180.202.861.31
including 2105002901.380.223.291.53
UGD811A2024nosignificantassays    
UGD8522024125476.2351.21.310.364.031.53
including 368476.21042.061.017.222.65
UGD853202492426.3334.30.700.132.190.79
including 322426.3104.30.890.334.451.10
UGD855A2024420.1484.264.11.160.294.301.35
UGD855B2024424.2428.74.50.440.111.090.51
  1. Analytical results are length weighted averages, only for the portions of the drill holes on the Entrée/Oyu Tolgoi JV Property.
  2. Lengths reported are drilled lengths. Approximate true widths are variable depending on the orientation of the drill hole. Several of the holes are geotechnical holes drilled subparallel to the trend of the porphyry. Other holes are drilled across the trend of the porphyry at varying orientations with estimated true widths ranging between approximately 20% and 70% of the drilled lengths.
  3. CuEq at HNE is calculated by the formula CuEq = Cu + ((Au * 35.7175) + (Ag * 0.5773)) / 67.9023, taking into account differentials between metallurgical performance and price for copper, gold and silver. Metal prices used are US$3.08/lb Cu, US$1,292.00/oz Au, and US$19.00/oz Ag. Metallurgical recoveries used are 82% for copper, 73% for gold and 78% for silver.

Figure 1: Plan View of Newly Released Assay Intervals and Locations of 2022-2024 Drill Holes

Figure 1: Plan View of Newly Released Assay Intervals and Locations of 2022-2024 Drill Holes

Eight of the ten 2023/2024 underground DDH with newly reported significant assays were drilled at moderate dips towards the north or northwest and after crossing onto the Entrée/Oyu Tolgoi JV Property intersected significant grades of copper and gold within the potential Lift 2 footprint of HNE. Drill holes UGD811A and 812 both reported no significant results; however, these holes had intersected the mineralized footprint on the Oyu Tolgoi mining licence, prior to crossing onto the Entrée/Oyu Tolgoi JV Property. Drill hole UGD578 (from 2022) was drilled horizontally towards the north, targeting the base of Lift 1, for geotechnical purposes, and intersected a wide interval of significant copper and gold mineralization.

The holes drilled into the mineralized porphyry intersected predominantly phyllic and potassic altered quartz monzodiorite, cut by occasional intervals of unmineralized biotite-granodiorite dikes (generally less than 10 m in drilled width). Total sulphide content is variable but averages around 5% and is comprised of a mix of chalcopyrite, bornite and pyrite hosted in quartz stockworks and disseminated form. Some of the highest-grade individual assays (grading around 5% to 10% CuEq) are often hosted within hydrothermal breccias, containing a majority of disseminated and coarse bornite and chalcopyrite.

2024 HNE DRILLING INFORMATION

The 2024 in-fill diamond drilling program at HNE included seven surface holes and 25 underground holes. As at January 27, 2025, a total of 4,652.1 m of surface drilling had been completed and 6,221.1 m of underground drilling had been completed on the Entrée/Oyu Tolgoi JV Property.

The 2024 underground holes were all collared from existing infrastructure on the Oyu Tolgoi mining licence and crossed onto the Entrée/Oyu Tolgoi JV Property. Several of the holes were drilled as "daughter holes” (wedges) from a "parent hole” at varying distances along the hole. Underground holes were designed to achieve multiple objectives; as in-fill holes within the mineralized footprint of Lift 2 to support the next mineral resource estimate update; for geotechnical purposes with many holes drilled outside of (west of) the mineralized footprint; and for metallurgical purposes.

All seven 2024 surface holes were collared vertically above, or just west of the mineralized footprint of HNE and drilled subvertically, or steeply to the east targeting Lift 2, or for geotechnical purposes. Three of the holes (EGD188, 190, 194) encountered drilling difficulties and did not reach the target depth, while two holes (EGD189, 189A) were drilled outside of the HNE footprint for geotechnical purposes. Drill holes EDG189B and EDG195 were drilled almost vertically through the northern portion of the HNE deposit and continued for almost 200 m below the base of Lift 2. Analytical results for the latter two surface holes are still pending.

Ten of the 2024 underground drill holes, denoted in Table 3 as having "no sampling”, were drilled from underground drill stations on the Oyu Tolgoi mining licence to the west of the mineralized footprint and were drilled mainly for geotechnical purposes to support infrastructure development.

Tables 2 and 3 summarize the drill hole details for 2024 HNE surface and underground drilling, respectively, and Figure 1 shows the locations of the 2022-2024 HNE drill holes and the significant assay intervals discussed in this press release.

Table 2: HNE 2024 Surface Drilling

Drill HoleUTM

EAST

UTM

NORTH

Elevation (masl)Length

(m)

Azimuth (degrees)Dip (degrees)Assay Status
EGD188652119.147685561172.8851,012.4101-83No sampling
EGD189652291.147684841173.33730.34-89No sampling
EGD189A652291.147684841173.33712.337-87No sampling
EGD189B652291.147684841173.33598.444-85Pending
EGD19065237647685591179525.9320-86No sampling
EGD19465237247685571178.9930.9334-85No sampling
EGD195652372.247685571178.991041.9332-87Pending
Total Surface   4652.1   
Notes: Holes EGD188, 190, 194 did not reach the target depth; holes EGD189, 189A were drilled outside of the mineralized footprint for geotechnical purposes; azimuth and dip information is taken from down-hole survey results, generally at about 15-30 m along the hole.

Table 3: HNE 2024 Underground Drilling1

Drill HoleUTM

EAST

UTM

NORTH

Elevation (masl)Length2

(m)

Length JV Property2

(m)

Azimuth (degrees)Dip

(degrees)

Assay Status
UGD806652234.74768067-76.31522425.6330-60Complete
UGD811A652059.34767907-80.8141342.546.8318-57Complete
UGD852652233.74768068-76.198476.5420.3352-44Complete
UGD852A652233.74768068-76.1984.44.4352-43Complete
UGD853652234.64768066-76.405426.3334.86.5-62Complete
UGD855652236.14768066-76.22473.7393.320-55Pending
UGD855A652236.14768066-76.2264.164.120-55Complete
UGD855B652236.14768066-76.224.54.520-55Complete
UGD871651968.54767859-180.585555.5198.928-37Pending
UGD872651968.54767859-180.604600194.727-45Pending
UGD873A651969.54767859-180.667562.5280.738-33Pending
UGD876652060.84767908-80.055461237.5355-27Pending
UGD881650757.64768019-50.805635541.0333-48No sampling
UGD882650757.24768018-50.727748620.3302-35No sampling
UGD883650755.84768019-51.725941.8808.9294-19No sampling
UGD884650756.44768019-51.77750405.2279-25No sampling
UGD894651631.24767960-127.27830843.829511No sampling
UGD895651631.14767961-126.7527192.631916No sampling
UGD896651635.84767964-127.875266130.83460No sampling
UGD909651635.54767964-128.053291158.8360-5No sampling
UGD915651637.94767963-128.306288.1152.210-5No sampling
UGD917A651967.24767862-180.531418.641.0343-50Pending
UGD918651968.94767861-180.214449.765.735-40Pending
UGD918A651968.94767861-180.21467.667.635-40Pending
UGD923650762.74768019-51.77589.4487.633-47No sampling
Total Underground JV Property 6,221.1   
  1. Holes UGD881 to 884, 894 to 896, 909, 915, and 923 were drilled outside of the mineralized footprint for geotechnical purposes; azimuth and dip information is approximate, taken from down-hole survey results, generally at about 0-30 m from the collar of the hole.