ILOILO CITY — The National Irrigation Administration (NIA) reported that it has achieved 91.18 percent completion of the feasibility study (FS) of the Panay River Basin Integrated Development Project (PRBIDP) in Capiz.
NIA-6 director Engr. Jonel Borres said the conduct of FS is simultaneous with the project's detailed engineering design phase.