THE Toll Regulatory Board (TRB) has approved the 2017 periodic toll petition put forth by Cavitex Infrastructure Corp. (CIC) and the Philippine Reclamation Authority (PRA). The petition entails toll rate adjustments for the 14-kilometer Manila-Cavite Expressway (Cavitex), a joint venture project between the two entities.

In accordance with the toll operation agreement between TRB, CIC and PRA, the Cavitex toll rates can be periodically adjusted every three years. Acting upon this provision, CIC and PRA submitted their petition for approval of periodic toll rate adjustment for R-1 Expressway (Seaside to Zapote) and R-1 Expressway Extension, Segment 4 (Zapote to Kawit) to TRB in 2017.

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details