(UPDATE) THE government is studying long-term solutions to the perennial flooding problem in Central Luzon, such as the construction of an impounding system in the Candaba Swamp and water collection pools.

During a situation briefing at the provincial capitol in the City of San Fernando following his inspection of typhoon-hit areas, President Ferdinand Marcos Jr. ordered an extensive study on the proposed impounding system.

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details