Visit to the actual operations of geotechnical investigation survey on the waters of Bataan. CONTRIBUTED PHOTO
Visit to the actual operations of geotechnical investigation survey on the waters of Bataan. CONTRIBUTED PHOTO

THE Department of Public Works and Highways (DPWH) is looking to complete by first quarter of 2023 the detailed engineering design (DED) works for the Bataan-Cavite Interlink Bridge, a 32-kilometer-long inter-island bridge project between the provinces of Bataan in Central Luzon and Cavite in Southern Tagalog Regions.

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details