THE Department of Public Works and Highways (DPWH) is looking to complete by first quarter of 2023 the detailed engineering design (DED) works for the Bataan-Cavite Interlink Bridge, a 32-kilometer-long inter-island bridge project between the provinces of Bataan in Central Luzon and Cavite in Southern Tagalog Regions.
Already have an active account? Log in here.
Continue reading with one of these options:
Continue reading with one of these options:
Premium + Digital Edition
Ad-free access
P 80 per month
(billed annually at P 960)
- Unlimited ad-free access to website articles
- Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)
TRY FREE FOR 14 DAYS
See details
See details
If you have an active account, log in
here
.