Heavy equipment work on widening a portion of the Tullahan River from the Tinajeros Bridge to Potrero in Malabon and Valenzuela cities. San Miguel Corporation’s P1 billion dredging initiative is on track to increase its daily waste and silt extraction output to 1,500 metric tons, to boost government’s flood mitigation efforts before the rainy season.

SAN Miguel Corporation is on track to more than double its daily dredging of silt and trash for its P1-billion Tullahan-Tinajeros river system cleanup project from 600 metric tons per day to 1,500 metric tons per day for the 11.5-km stretch it is working on.

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details