SUWECO Tablas Energy Corp. (STEC) recently switched on the hybrid solar-diesel microgrid with battery facility in Romblon, dubbed as the first and largest hybrid facility in the country.
President Rodrigo Duterte on Wednesday led the inauguration the P550-million Tumingad Solar Power Plant located in a 9-hectare property in Tablas Island. It is capable of meeting the daytime power requirements of 43,000 households in the island.
Already have an active account? Log in here.
Continue reading with one of these options:
Continue reading with one of these options:
Premium + Digital Edition
Ad-free access
P 80 per month
(billed annually at P 960)
- Unlimited ad-free access to website articles
- Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)
TRY FREE FOR 14 DAYS
See details
See details
If you have an active account, log in
here
.