PSI’s 20-MW power plant to go online this month

THE 20-megawatt (MW) bunker-fired power plant of Peakpower Socsargen Inc. (PSI) in General Santos City is set to go online this month.

PSI President Roel Castro said the firm is about to complete its testing and commissioning of the power facility located inside the compound of local electric distributor South Cotabato Electric Cooperative II (SOCOTECO II) in Barangay Apopong, General Santos City.